Print using your browser, or save as PDF. Complete this with the coffee, valve and pouch teams. This is a planning record, not a performance certificate or acceptance standard.
| Project / date / reviewers | |
|---|---|
| Pouch sample ID / specification revision | |
| Whole bean or ground / roast or grind / net weight | |
| Roast-to-pack interval / filling and gas-flush process | |
| Material / dimensions / closure / valve model | |
| Valve installation / position / clearances / drawing revision | |
| Seal condition / fill level / installation observations | |
| Trial method / agreed checks / responsible team | |
| Observation period / storage and handling conditions | |
| Dated observations / lot references / deviations | |
| Decision / follow-up / approved reference |